home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V12_0 / V12_082.ZIP / V12_082
Internet Message Format  |  1991-07-08  |  16KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/YaczqN600VcJARcU5r>;
  5.           Wed, 18 Jul 1990 02:11:37 -0400 (EDT)
  6. Message-ID: <Aaczpte00VcJ0Rak4F@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Wed, 18 Jul 1990 02:11:06 -0400 (EDT)
  12. Subject: SPACE Digest V12 #82
  13.  
  14. SPACE Digest                                      Volume 12 : Issue 82
  15.  
  16. Today's Topics:
  17.                Re: clean rooms
  18.    Earth moving (was Re: Is an asteroid capture possible/feasible?
  19.               Re: Titan boosters
  20.                 Re: Titan HLV
  21.       CRRES launch delayed one to two weeks (Forwarded)
  22.                    Re: EOS
  23.             Re: NASA's lobbying on the net
  24.           Re: Chinese Long March: curse or blessing?
  25.               Re: Why drop the shuttle?
  26.            Payload Status for 07/10/90 (Forwarded)
  27.  
  28. Administrivia:
  29.  
  30.     Submissions to the SPACE Digest/sci.space should be mailed to
  31.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  32.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  33.              tm2b+@andrew.cmu.edu
  34.  
  35. ----------------------------------------------------------------------
  36.  
  37. Date: 16 Jul 90 14:47:30 GMT
  38. From: serre@boulder.colorado.edu  (SERRE GLENN)
  39. Subject: Re: clean rooms
  40.  
  41. Just to give some perspective on "clean rooms" used for payload processing, 
  42. the "clean room" at LC-41 is operated as if it were a class 100,000 (10e5) 
  43. clean room (LC-41 is were they launch Titan IVs).  
  44.  
  45. --Glenn Serre
  46. serre@tramp.colorado.edu
  47.  
  48. ------------------------------
  49.  
  50. Date: 17 Jul 90 00:12:07 GMT
  51. From: agate!sandstorm.Berkeley.EDU!gmohr@ucbvax.Berkeley.EDU  (Gordon J. Mohr)
  52. Subject: Earth moving (was Re: Is an asteroid capture possible/feasible?
  53.  
  54. In article <3111@rwthinf.UUCP> dieter@rwthinf.UUCP (Dieter Kreuer) writes:
  55. >
  56. >There has been a fairly long discussion about nuking earthbound asteroids
  57. >in sci.astro recently. While I totally agree to try everything to move
  58. >such a dinosaur-killer in any other direction than towards Earth, I would
  59. >strongly refuse to bring such a thing intentionally close to our planet.
  60.  
  61. And in article <6604@helios.TAMU.EDU> h1c5962@tamuts.tamu.edu (Lee Cox)
  62. writes:
  63. >
  64. >In article <269d2e77-580sci.space@vpnet.chi.il.us> vortex@vpnet.chi.il.us (Jason J. Levit) writes:
  65. >>  Anybody hear about this new asteroid that passed within 3 million
  66. >>  miles of earth?  If not, here's the details...
  67. >>  [details omitted]
  68. >>  So, another "near miss".  They're coming closer and closer and
  69. >>  closer....how many would have liked to nuke this one?  :-)
  70. >
  71. >Yep, it's about time to build a few more Saturn V IPBMs (Inter-Planetary
  72. >Ballistic Missiles).
  73.  
  74. Actually, I understand that Russian scientists have calculated that, given
  75. enough warning, it would actually be easier to MOVE THE EARTH than divert
  76. a distant, rapidly approaching asteroid. How? Altering the moon's mass with 
  77. nuclear charges. The moon's orbit would change, also affecting the Earth's
  78. solar orbit. A slight change, over time, would mean a gigantic difference
  79. in where the Earth is at some future time.
  80.  
  81. While I can't remember where I read that tidbit, in a recent Chemical &
  82. Engineering News (perhaps sometime in June), a similar story highlighted our
  83. equivalent ability to change the Earth's tilt and other planetary parameters
  84. by altering the moon. A mathematician (I think..) argued that there's no
  85. reason to assume the current values are optimal for the well-being of man
  86. or other life, and so we could run computer simulations to find better
  87. ones.
  88.  
  89. How's that for risky?
  90.  
  91. Gordon Mohr
  92. gmohr@ocf.berkeley.edu
  93.  
  94. ------------------------------
  95.  
  96. Date: 14 Jul 90 04:09:18 GMT
  97. From: mnetor!utzoo!henry@uunet.uu.net  (Henry Spencer)
  98. Subject: Re: Titan boosters
  99.  
  100. In article <13415@shlump.nac.dec.com> hughes@star.dec.com (Gary Hughes - VMS Development) writes:
  101. >... the only in flight SRM failure that I know of was the explosion caused
  102. >by propellant delamination on a Titan 34D. I wonder if that would have been
  103. >survivable, even with a Mercury/Apollo style LES.
  104.  
  105. I have my doubts.  The escape towers were pretty effective given the
  106. slightest bit of warning -- the Apollo one, for example, took the
  107. capsule off the booster at *twelve gees*, rising (!) somewhat as the
  108. escape rocket burned off fuel -- but on the Titan SRB failure I
  109. think there was no warning at all.  Just BOOM.  (It must have been
  110. an impressive thing to see; even the still photos in AW&ST looked
  111. like a spectacular fireworks display.)
  112. -- 
  113. NFS:  all the nice semantics of MSDOS, | Henry Spencer at U of Toronto Zoology
  114. and its performance and security too.  |  henry@zoo.toronto.edu   utzoo!henry
  115.  
  116. ------------------------------
  117.  
  118. Date: 14 Jul 90 13:48:25 GMT
  119. From: pacific.mps.ohio-state.edu!zaphod.mps.ohio-state.edu!usc!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Charles.Radley@tut.cis.ohio-state.edu  (Charles Radley)
  120. Subject: Re: Titan HLV
  121.  
  122. A small company (OSC) can build a small launcher (Pegasus), but it takes 
  123. a big company (Martin Marietta) to build a big launcher (Titan).
  124. There is no free lunch.
  125.  
  126.  
  127. --  
  128. Charles Radley
  129. Internet: Charles.Radley@ofa123.fidonet.org
  130. BBS:      714 544-0934   2400/1200/300
  131.  
  132. ------------------------------
  133.  
  134. Date: 16 Jul 90 01:53:33 GMT
  135. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  136. Subject: CRRES launch delayed one to two weeks (Forwarded)
  137.  
  138. Brian Dunbar
  139. Headquarters, Washington, D.C.                      July 12, 1990
  140. (Phone:  202/453-1547)
  141.  
  142. George Diller
  143. Kennedy Space Center, Fla.
  144. (Phone:  407/867-2468)
  145.  
  146. Jim Sahli
  147. Marshall Space Flight Center, Huntsville, Ala.
  148. (Phone:  205/544-6528)
  149.  
  150.  
  151. RELEASE:  90-98
  152.  
  153. CRRES LAUNCH DELAYED ONE TO TWO WEEKS
  154.  
  155.  
  156.      A computer problem with the spacecraft's command and data 
  157. processing system will delay the launch of the Combined Release 
  158. and Radiation Effects Satellite (CRRES) 1 to 2 weeks.
  159.  
  160.      During a spacecraft countdown practice at Cape Canaveral Air 
  161. Force Station, Fla., Launch Pad 36B, on Wednesday, July 11, an 
  162. intermittent failure occurred when commands were not properly 
  163. received and executed by the command and data processing system. 
  164.  
  165.      Additional testing indicated that the malfunction probably 
  166. is within the primary command decoder unit (CDU), which receives 
  167. and decodes commands from the ground, then formats and 
  168. distributes the commands through the spacecraft.  Tests to 
  169. pinpoint the location of the failure should be completed by late 
  170. Thursday.
  171.  
  172.      The spacecraft's backup CDU functioned properly.  However, 
  173. under NASA launch-commit criteria, both CDUs must be fully 
  174. operational for a launch to take place.
  175.  
  176.      If the problem lies in the CDU, which was tested 
  177. successfully twice at the Kennedy Space Center (KSC), the box 
  178. containing both units will be removed from the spacecraft and 
  179. returned to the manufacturer, Gulton Data Systems Division, to 
  180. determine the cause of failure and to effect repairs.  
  181.  
  182.      A new launch date will not be set until the CDU has been 
  183. repaired and returned to KSC.  The mission was originally 
  184. scheduled for launch July 17. 
  185.  
  186.      CRRES is a joint NASA/U.S. Air Force Mission to study the 
  187. effects of chemical releases on the Earth's ionosphere and 
  188. magnetosphere and to monitor the effects of the space radiation 
  189. environment on sophisticated electronics.  The spacecraft will be 
  190. launched aboard an Atlas I (Atlas-Centaur 69) vehicle, with 
  191. launch services provided by General Dynamics Space Systems 
  192. Division.
  193.  
  194. ------------------------------
  195.  
  196. Date: 16 Jul 90 19:29:14 GMT
  197. From: groucho!steve@handies.ucar.edu  (Steve Emmerson)
  198. Subject: Re: EOS
  199.  
  200. In <2842.26a1920c@cc.curtin.edu.au> tgumleyle@cc.curtin.edu.au (Liam 
  201. Gumley) writes:
  202.  
  203. >In article <743.269B896F@ofa123.fidonet.org>, 
  204. David.Anderman@ofa123.fidonet.org (David Anderman) writes:
  205.  
  206. >> If EOS becomes a big project, NASA will screw it up.
  207.  
  208. >However, this does not mean that NASA will screw it up.  NASA has for the last
  209. >30 years or so taken the lead in fostering initiatives in satellite remote
  210. >sensing of the earth. This has led, among other things, to the operational use
  211. >of weather satellites.  It has involved a high level of interaction between
  212. >NASA and other research institutions.  The trend in the past seems to have been
  213. >that NASA sponsors the development of experiemntal platforms (e.g. the early
  214. >ATS, TIROS, Nimbus) and instruments, which are then upgraded to 'operational'
  215. >status (e.g. GOES, GMS, TIROS-N/NOAA).  When you consider that these days it
  216. >takes the best part of 100 million US dollars and 5 to 10 years to develop,
  217. >test, and launch a major earth remote sensing payload, who else is capable
  218. >except NASA ?
  219.  
  220. For smaller projects, I know several institutions that could -- and have.
  221.  
  222. >> Furthermore, NASA will make EOS into a technology development program, 
  223. >> rather than an applications program.
  224.  
  225. >Technology development runs in parallel with the development of new remote
  226. >sensing instruments for particular science missions.  For example if you want
  227. >to fly a Michelson interferometer onboard a spacecraft to sense atmospheric
  228. >temperature, moisture and trace gases, you need to develop infra-red detector,
  229. >laser, cryogenic,  electronics and data communication technology to do it.
  230. >However the technology developement is not the point of EOS.  The point is that
  231. >there are some very important questions about the nature of the earth
  232. >environment that need prompt investigation.
  233.  
  234. One of the problems from a user's (i.e. meteorologist's or
  235. oceanographer's) perspective is that the increasing size of the
  236. projects causes them to become relatively insulated from the user
  237. during design and implementation -- the project becomes so large that
  238. it's simply no longer feasible to have a significant amount of
  239. scientific oversight (and veto power!) on the design process.  There
  240. are simply too many cooks.
  241.  
  242. Smaller projects tend not to suffer from this problem.  (Fewer cooks).
  243.  
  244. Another problem is that large projects have a tendancy to incure cost
  245. and time overruns, which are very bad when attempting a prompt
  246. investigation.
  247.  
  248. An example is the next-generation GOES satellite.  It's a three-axis
  249. stabilized platform rather than the original spin-stabilized platform.
  250. This design change has resulted in technical and cost-overrun problems
  251. and, furthermore, means that the scan lines can now overlap or even be
  252. unrelated to one another -- considerably increasing the complexity of
  253. the subsequent data analysis.  Yet, I haven't met a remote-sensing
  254. meteorologist or oceanographer who is happy with this change.
  255.  
  256. It's almost as though: 1) people realize that a better system is
  257. theorectically possible and go for it -- failing to realize that the
  258. increased managerial overhead can result in a poorer product; and 2)
  259. the bureaucratic/industrial complex -- for reasons of its own --
  260. prefers large projects.
  261.  
  262. >Let's hear from some more remote sensing people on this, and other topics !  
  263.  
  264. I used to be in remote-sensing.  I would like to see more smaller
  265. projects -- each having more scientific oversight -- than currently
  266. exists.  I believe that this would be more cost effective and more
  267. scientifically efficatious.
  268.  
  269. Naturally, the above opinions are my own.
  270.  
  271. Steve Emmerson        steve@unidata.ucar.edu        ...!ncar!unidata!steve
  272.  
  273. ------------------------------
  274.  
  275. Date: 13 Jul 90 19:16:44 GMT
  276. From: n3dmc!gronk!johnl@uunet.uu.net  (John Limpert)
  277. Subject: Re: NASA's lobbying on the net
  278.  
  279. szabonj@ibmpa.UUCP (Nicholas J. Szabo) writes:
  280. >I might point out that the use of NASA equipment itself is also at issue.
  281. >I would guess that the same ethical, and probably also legal, guidelines
  282. >apply to the use of this equipment whether by employees, contractors, or
  283. >anyone else.  Also, promoting NASA funding, insulting Congressmen  (the
  284. >source of NASA's funding :-) and disparaging competing agency's efforts
  285. >sound pretty close to political activity to my ears.
  286.  
  287. So I can't post an article to sci.space with a NASA computer unless
  288. it meets Mr. Szabo's standards for political content?
  289.  
  290. I would rather unsubscribe than submit to this sort of censorship.
  291.  
  292. -- 
  293. John Limpert        johnl@gronk.UUCP    uunet!n3dmc!gronk!johnl
  294.  
  295. ------------------------------
  296.  
  297. Date: 14 Jul 90 14:01:56 GMT
  298. From: usc!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Charles.Radley@ucsd.edu  (Charles Radley)
  299. Subject: Re: Chinese Long March: curse or blessing?
  300.  
  301. There are no PC clones from the soviet union, US export controls have 
  302. prevented them from acquiring that technology.
  303. Your scenario is interesting, but alas unrealistic.
  304. The Chinese will stimulate the market for THEMSELVES.   Right now there 
  305. is a GLUT of launchers, and little demand.   Existing companies are 
  306. struggling to compete.   Pacific American Rocket comapny, and SSI have 
  307. both folded in the last year.
  308. The real fear in the short term, is the Chinese destroying Western 
  309. launch comapnies by taking away their business.
  310. By the time demand for launchers increases it will be too late.   The 
  311. western suppliers will have been wiped out of business, and the Chinese 
  312. will have a monopoly, which they will of course use for their own 
  313. political and foreign policy objectives.
  314.  
  315.  
  316. --  
  317. Charles Radley
  318. Internet: Charles.Radley@ofa123.fidonet.org
  319. BBS:      714 544-0934   2400/1200/300
  320.  
  321. ------------------------------
  322.  
  323. Date: 14 Jul 90 19:39:17 GMT
  324. From: zephyr.ens.tek.com!tektronix!percy!3cpu!brycen@uunet.uu.net  (Bryce Nordgren)
  325. Subject: Re: Why drop the shuttle?
  326.  
  327. >Not very practical: The shuttle weights 90 tons, more than 4 Mirs, and
  328.  
  329. Egads!  I had no idea.  I knew it was heavy, but didn't know quite how much.
  330.  
  331. [Stuff deleted...]
  332. >For instance, for the glidding abilities, I have read somewhere that the
  333. >best the shuttle can do is 1:2.27 i.e. each time it looses 1 mile in
  334. >altitude, it travels 2.27 miles horizontaly... So what do you want to
  335. >do with that in a Martian context (Perhaps Venus will do... Oh!!! Great
  336. >idea for me!!!!!). Besides, how 2 or 3 people (not 7 I guess :-) ) are going
  337. >to live for many month in a place designed for 1 week max.?
  338. >
  339. >Mark S.
  340. >-------
  341.  
  342. I thought that the shuttle had been up for longer than that at a time.  In any
  343. case, I was thinking that the expendible stuff could be stored in the cargo
  344. bay, and they could go fetch what they needed when they needed it.  In any case,
  345. this becomes a pointless discussion because of your first and second points.
  346. (Not to mention the fact that the Shuttle is supposed to need maintenance every
  347. 300 hours of use.  (This I received in the mail from another alert user in the
  348. know.))
  349.  
  350.   Sorry for wasting the net's $$$ and time.  I just thought of this, and it
  351.   *seemed reasonable at the time. ;)
  352.  
  353.     -----Brycen
  354.  
  355. ------------------------------
  356.  
  357. Date: 16 Jul 90 02:43:51 GMT
  358. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  359. Subject: Payload Status for 07/10/90 (Forwarded)
  360.  
  361.  
  362.     Daily Status/KSC Payload Management and Operations 07-10-90.
  363.     
  364.     
  365.     - STS-35 ASTRO-1/BBXRT (at OPF) -
  366.     
  367.     Experiment monitoring continues.
  368.     
  369.     
  370.     - STS-37 GRO (at PHSF) -
  371.     
  372.     GSE checkout will be preformed today.
  373.     
  374.     
  375.     - STS-40 SLS-1 (at O&C) -
  376.     
  377.     Closeout inspections and STT preps continue.
  378.     
  379.     
  380.     - STS-41 Ulysses (at Hanger AO) -
  381.     
  382.     At the VPF, CITE preps continue.
  383.     
  384.     
  385.     - STS-42 IML-1 (at O&C) -
  386.     
  387.     Rack, floor, and module staging is continuing.
  388.     
  389.     
  390.     - Atlas-1 (at O&C) -
  391.     
  392.     Freon line and electrical cable installations are
  393.     continuing.
  394.     
  395.     
  396.     - STS-46 TSS-1 (at O&C) -
  397.     
  398.     No work is scheduled for today.
  399.     
  400.     
  401.     - STS-47 Spacelab-J (at O&C) -
  402.     
  403.     Rack staging continues.
  404.     
  405.     - HST M&R -
  406.     
  407.     MLI installation will be active today.
  408.  
  409. ------------------------------
  410.  
  411. End of SPACE Digest V12 #82
  412. *******************
  413.